JIAMOO / Doors

Sliding Door.

Barn-style and concealed-track sliding doors for room transitions and space-conscious layouts.

Explore the collection
THE COLLECTION

Barn sliding doors

Browse the designs and open each image to see the model references.

MSD 156 / 157

Model references
MSD-156 / MSD-157

MSD 158 / 159

Model references
MSD-158 / MSD-159

MSD 160 / 161

Model references
MSD-160 / MSD-161

MSD 162 / 163

Model references
MSD-162 / MSD-163

MSD 164 / 165

Model references
MSD-164 / MSD-165

MSD 166 / 167

Model references
MSD-166 / MSD-167

MSD 168

Model references
MSD-168

MSD 169 / 170

Model references
MSD-169 / MSD-170

MSD 171 / 172

Model references
MSD-171 / MSD-172

MSD 173 / 174

Model references
MSD-173 / MSD-174

MSD 175 / 176

Model references
MSD-175 / MSD-176

MSD 177 / 178

Model references
MSD-177 / MSD-178

MSD 179 / 180

Model references
MSD-179 / MSD-180

MSD 181 / 182

Model references
MSD-181 / MSD-182
THE COLLECTION

Concealed-track sliding doors

Browse the designs and open each image to see the model references.

MSD 126 / 127

Model references
MSD-126 / MSD-127

MSD 128 / 129

Model references
MSD-128 / MSD-129

MSD 130 / 131

Model references
MSD-130 / MSD-131

MSD 132 / 133

Model references
MSD-132 / MSD-133

MSD 134 / 135

Model references
MSD-134 / MSD-135
PROJECT DETAILS

From layout to details.

Door schedule

Specify the room, selected design, opening dimensions, wall thickness and quantity. Include the model reference when shown.

Hardware & finish

Confirm the leaf finish, frame, architraves, handles, lock and hinges or track for each opening.

Opening & clearances

Check the opening direction, finished floor level and operating clearance. Pocket and sliding doors also need the wall or track space confirmed.

How should the door opening be measured?

Measure the height on the left, in the middle and on the right; measure the width at the top, middle and bottom. Use the smallest height and width. Measure wall thickness at three positions and use the largest reading. Allow for the finished floor level. The catalogue calls for the opening to be corrected if the height or width readings differ by more than 20 mm.

How is the opening direction specified?

For a hinged door, identify the left- or right-hand side and whether it opens inward or outward, viewed from outside the room. Mark the swing on the plan and confirm it with the door schedule.

What does the installation sequence include?

The catalogue shows frame and leaf checks, frame assembly, fixing the frame with plates, fitting hinges and the leaf, installing the lock and stop, and fitting the architraves. The installer should confirm the fixing method and hardware for the selected door system.

Which dimensions are needed for the order?

Distinguish the door leaf size, clear opening inside the frame, outer frame size and overall size including architraves. Confirm wall thickness, undercut, hinges and lock positions in the final drawing.

YOUR PROJECT

Let’s find the
right fit.

Share your preferred collection or model, required dimensions, quantities and project location.

Back to DoorsBack to top
THE COLLECTIONS

Custom cabinetry

Get a Free Quote

Please send your project details and floor plan. We will reply with the next steps as soon as possible.

JIAMOO dining project with custom furniture and cabinetry
Products required

We will use your details only to respond to this project enquiry.